Industrial zone or industrial cluster in Ninh Binh?

Location decides where you file, which incentives apply and your operating costs for years. This article sums up the options in Ninh Binh, current planning figures and the criteria to compare before signing a lease.

TTK Vietnam · Updated 13 Oct 2026 · 4 min read

Key points

  • Projects inside an industrial zone file with the Industrial Zone Management Board; in a cluster or outside zones, with the Department of Finance.
  • The provincial plan includes dozens of operating industrial zones and clusters; many more are under construction or newly added to the plan.
  • Compare at least two options on rent, infrastructure, logistics and incentives before finalising the IRC file.

Types of location

Location decides the licensing authority, incentives and many other conditions. Choose the site before finalising the IRC file.

  • Industrial zone: File with the Industrial Zone Management Board; integrated infrastructure; deal with the zone infrastructure developer on land or factory lease
  • Industrial cluster and outside zones: File with the Department of Finance; check planning and land procedures carefully, especially for clusters newly formed after the merger
  • Leased ready-built factory: Faster to start production; needs a valid lease and the lessor’s legal documents
  • IRC conditions on location: Documents proving the right to use the site (land-use rights or a lease); consistency with planning; meeting investment-per-land-area and labour conditions if the province sets them (Article 39, Decree 96/2026/ND-CP)
Common pitfall

A site without valid evidence of land-use rights or not matching planning

Planning figures

20
Operating industrial zones · 4,987.68 ha
25
Operating industrial clusters · 1,169.9 ha
97
Industrial zones in the plan · 47,795.88 ha
114
Industrial clusters in the plan · 6,556.4 ha

Operating industrial zones

NameLocation (commune, ward)Area (ha)Incentive location
Hòa Xá IZPhường Thành Nam, phường Đông A285.37—
Mỹ Trung IZPhường Thiên Trường148.15—
Bảo Minh IZXã Liên Minh, xã Vụ Bản, phường Trường Thi151.52—
Bảo Minh mở rộng IZXã Liên Minh, xã Vụ Bản44.68—
dệt may Rạng Đông IZXã Rạng Đông503.38Commune on the list
Mỹ Thuận IZPhường Mỹ Lộc, xã Hiển Khánh158.62—
Gián Khẩu IZXã Gia Trấn, xã Gia Vân243.68Commune on the list
Khánh Phú IZPhường Đông Hoa Lư355.54—
Tam Điệp I IZPhường Tam Điệp95Commune on the list
Khánh Cư IZXã Yên Khánh52.28—
Phúc Sơn IZPhường Đông Hoa Lư, phường Nam Hoa Lư129.4—
Đồng Văn I IZPhường Duy Hà, phường Đồng Văn370.06—
Đồng Văn II IZPhường Duy Hà, phường Đồng Văn321—
hỗ trợ Đồng Văn III IZPhường Đồng Văn, phường Duy Hà, phường Tiên Sơn, phường Hà Nam, phường Duy Tiên523—
Đồng Văn IV IZPhường Lê Hồ, phường Kim Thanh300—
Châu Sơn IZPhường Châu Sơn, phường Phù Vân, phường Lý Thường Kiệt377—
Hòa Mạc IZPhường Duy Tiên, phường Duy Tân131—
Thanh Liêm IZPhường Châu Sơn, xã Liêm Hà, xã Tân Thanh293—
Thái Hà IZXã Trần Thương, xã Bắc Lý200Commune on the list
Kim Bảng I IZPhường Lê Hồ305—

Areas as planned. Available land and rents change often; TTK verifies them on request.

Compare zones on the Locations page →

Transport and logistics links

  • Expressways: North-South (CT.01), Ninh Binh-Hai Phong (CT.08), Phu Ly-Nam Dinh (CT.11), Hanoi Ring Road 5 southern section (CT.39)
  • National Highway 1 and highways 10, 21, 37B, 38, 39B plus the provincial road network
  • North-South railway and the planned North-South high-speed railway; the North-South economic corridor is the main driving axis linking Hanoi
  • Ninh Co deep-water port and river ports; Ninh Binh Airport oriented to international standard (class 4C)
  • Regional logistics centres along the corridors and driving axes

This is planning orientation; implementation follows each project approved by the competent authority.

Criteria for comparing sites

  • Size and type of facility: Lease land and build, or lease a ready-built factory; area needed now and room to expand
  • Sectors the zone may attract, and the project’s environmental and wastewater requirements
  • Distance to expressways, ports, Hanoi and the labour pool
  • Rent, management fees, lease term and land handover schedule
  • Incentive locations and land rent incentives that may apply
  • Legal status of the zone: Established, infrastructure under construction, or only in the plan

Tip: Compare at least 2 site options on rent and management fees, power, water and wastewater infrastructure, logistics and incentives before signing a lease.

Want TTK to take a quick look at your project?

The first consultation is free. Briefly describe your sector, capital and intended location.

Get free advice

FAQ

Do I need an IRC to lease a ready-built factory?

Yes, for a foreign investor’s project. The factory lease or lease agreement is the site evidence in the IRC file, together with the lessor’s legal documents.

Can I invest right away in a zone newly added to the plan?

Not necessarily. The zone must be established and have infrastructure and a developer before land can be leased. Each zone’s status is shown on the Locations page.

This website is operated by TTK Vietnam Joint Stock Company and is not a government information portal. Content is for reference only; TTK confirms against current regulations for each project.

Want TTK to take a quick look at your project?

Briefly describe your project (sector, planned capital, location). TTK will get back to you.

Call now